Frontier — What you actually get

The Playbook is not a brochure. Here is every page of it.

People ask what a Frontier Playbook is. So here is a real specimen of each deliverable — and a full sample deck you can open, print, and keep. Illustrative — not a real client's confidential package.

A Frontier Playbook is six deliverables that move a specific audience from “who are you” to “you are on the package.” Below is what each one looks like when it lands on a developer’s desk.

The specimens use the Northern Utah electrical-contractor case so they are concrete. Names and figures are illustrative; the structure is exactly what we ship.

See the whole thing as one document

Open the full sample Playbook deck — US Letter, 8.5×11, print or save as PDF.

Open the sample Playbook deck
High-voltage substation and transmission lines at dusk in the desert

One coherent package — the standard a hyperscale EPC selection actually runs on.

Deliverable 01 · Sample specimen — illustrative

Capabilities & procurement kit

A capability matrix mapped to how hyperscale procurement scores you — scope, the standard it is judged against, and the proof attached.

ScopeStandard it is judged againstProof attached
Substation + switchgearIEEE C37 / NETA acceptanceCommissioning records, as-builts
Medium-voltage distribution4–35 kV, NEC + utility specThree comparable installs
Backup power integration<50 ms transfer under full loadWitnessed transfer test report
Energization sequencingPhased to cooling/load rampSequence plan + prior schedule
Safety + bondingEMR / OSHA 300AThree-year rate, zero lost-time

Deliverable 02 · Sample specimen — illustrative

Case-study system

Past work rewritten as proof of relevant scale, in the challenge/approach/result form a selection committee reads in 90 seconds.

ChallengeApproachResult
400 MW multi-phase campus; switchgear and tie-in across four buildings while cooling was still being finalized.Sequenced the electrical work to the cooling deployment; redundant feeds per building; coordinated parallel generator testing with the utility.Full campus energized on schedule. Zero thermal incidents. 4 MW backup per building proven at <50 ms transfer.
Utility substation two miles out; transmission extension needed across permitted land.Led right-of-way, environmental, and utility coordination as pre-work, then mobilized the line crew on permit clearance.Switchgear live in 16 weeks; campus online ahead of server delivery; became lead electrical partner for the next phase.

Deliverable 03 · Sample specimen — illustrative

Energization sequence model

The phased plan that proves you can bring power on in step with the cooling and load ramp — the question every developer asks and most contractors cannot answer on paper.

PhaseTriggerGate before next phase
P0 — Utility tie-in energizedInterconnect approvalProtection + relay test signed
P1 — Building A switchgear liveCRAC commissioning ALoad bank to 60%, thermal stable
P2 — Building B + backup provenGenerator witnessed test<50 ms transfer under full load
P3 — Full campus parallelAll halls acceptedUtility parallel-operation sign-off
Heavy-haul convoy moving a massive transformer through the desert

The sequence behind the schedule — modeled before a single crew mobilizes.

Deliverable 04 · Sample specimen — illustrative

Risk register

The failure questions answered before they are asked. This is the page that turns a nervous committee into a confident one.

RiskLikelihood / impactMitigation on record
Interconnect approval slipsMed / HighPre-work started at LOI; utility desk engaged early
Long-lead transformer delayMed / HighOrder at award; alternate vendor qualified
Thermal excursion at rampLow / HighPhased gates; load-bank proof before each step
Crew availability at peakMed / MedNamed foremen; second crew on standby clause

Deliverable 05 · Sample specimen — illustrative, names generalized

Target list + warm path

Not a list you cold-email. The specific decision-makers, why you fit their next project, and the actual introduction path — warm.

TargetWhy you fit their next movePath in
Regional EPC — IntermountainNeeds a Utah-based electrical sub for a live campus phaseWarm intro via Frontier network
Hyperscale dev team — UT campusSequencing risk on the electrical critical pathTargeted brief to the construction lead
Rocky Mountain utility — interconnect deskContractor coordination on parallel operationExisting Frontier relationship
Owner's rep / PM firmWants a vetted electrical bench, not a bid lotteryCapabilities kit pre-positioned

Deliverable 06 · Sample specimen — illustrative

Executive one-pager

The single page that makes selecting you the easy decision in the room. Headline, four proofs, the ask. Nothing else.

Northern Utah electrical contractor, ready to own the power critical path on your campus — substation through energization, sequenced to your cooling ramp.

01Substation, switchgear, and medium-voltage delivery with commissioning records on file.
02Energization sequenced to the cooling and load ramp — plan attached, not promised.
03Backup power proven at <50 ms transfer under full load on comparable scale.
04Three-year EMR below threshold; zero lost-time incidents; named foremen.

The ask: a 30-minute scoping call before the electrical package is awarded.

That is the Playbook

Six deliverables, one coherent package, built to the standard the national firms show up with — so a developer can choose you without a six-month evaluation.

DeliverableWhat it does for you
Capabilities & procurement kitPresents you at the standard selection runs on
Case-study systemTurns past work into proof of relevant scale
Energization sequence modelShows you can phase power with the cooling ramp
Risk registerAnswers the failure questions before they are asked
Target list + warm pathThe specific decision-makers — and the introduction
Executive one-pagerMakes selecting you the easy decision in the room

Now you have seen it. Let us build yours.

Tell us your capability and your region. You get back a Frontier Playbook in this exact shape — built around your asset, your targets, your path in.

Start the Conversation

Industries We Serve

Aerospace & DefenseBiotechnologyMedical & HealthcareManufacturingFinancial ServicesConsumer ProductsEnterprise Software

New Business

Start a project

Headquarters

North America

© 2026 Bttr. All rights reserved.