WASATCH GRID ELECTRICAL
Electrical critical-path partner
Power on schedule.
Zero thermal incidents.

Substation through energization for AI data-center campuses · Northern Utah

Prepared for: Hyperscale EPC — Intermountain region

Illustrative sample. Wasatch Grid Electrical is a fictional company; a real Playbook is produced in the client’s own brand.Capabilities dossier
Wasatch Grid ElectricalExecutive summary
Why us, in one page

The Northern Utah electrical prime that has already energized a 400 MW campus on schedule — substation through energization, sequenced to your cooling ramp, so the schedule never waits on electrical.

  • 01Substation, switchgear, and medium-voltage delivery with commissioning records on file.
  • 02Energization sequenced to the cooling and load ramp — a plan attached, not a promise.
  • 03Backup power proven at <50 ms transfer under full load at comparable scale.
  • 04EMR 0.71 (3-yr average); zero lost-time incidents; $40M single / $120M aggregate bonding; named foremen on day one.

The ask: a 30-minute scoping call before the electrical package is awarded.

Illustrative sample. Wasatch Grid Electrical is a fictional company; a real Playbook is produced in the client’s own brand.2 / 8
Wasatch Grid ElectricalCapabilities & procurement
Scored the way procurement scores you

Every claim has proof attached.

ScopeStandard judged againstProof attached
Substation + switchgearIEEE C37 / NETA acceptanceCommissioning records, as-builts
Medium-voltage distribution4–35 kV, NEC + utility specThree comparable installs
Backup power integration<50 ms transfer, full loadWitnessed transfer test report
Energization sequencingPhased to cooling/load rampSequence plan + prior schedule
Safety + bondingEMR / OSHA 300A3-yr rate, zero lost-time
Illustrative sample. Wasatch Grid Electrical is a fictional company; a real Playbook is produced in the client’s own brand.3 / 8
Wasatch Grid ElectricalProof of relevant scale
We have already done this
Scope
$18.4M electrical prime · 400 MW · 4 buildings · 2024 · EMR 0.68 at the time
Challenge
Multi-phase campus; switchgear and tie-in across four buildings while cooling was still being finalized.
Approach
Sequenced electrical to the cooling deployment; redundant feeds per building; coordinated parallel generator testing with the utility.
Result
Full campus energized on schedule. Zero thermal incidents. 4 MW backup per building at <50 ms transfer.
Reference
Project Director, hyperscale operator — available under NDA.
Scope
$6.1M electrical prime · 35 kV transmission extension · 2023
Challenge
Utility substation two miles out; transmission extension needed across permitted land.
Approach
Led right-of-way, environmental, and utility coordination as pre-work; mobilized the line crew on permit clearance.
Result
Switchgear live in 16 weeks; campus online ahead of server delivery; retained as lead electrical partner for the next phase.
Reference
EPC construction lead — available on request.
Illustrative sample. Wasatch Grid Electrical is a fictional company; a real Playbook is produced in the client’s own brand.4 / 8
Wasatch Grid ElectricalEnergization sequence
Power phased to your ramp

The plan, before a crew mobilizes.

PhaseTriggerGate before next phase
P0 — Utility tie-inInterconnect approvalProtection + relay test signed
P1 — Building A liveCRAC commissioning ALoad bank to 60%, thermal stable
P2 — Building B + backupGenerator witnessed test<50 ms transfer, full load
P3 — Full campus parallelAll halls acceptedUtility parallel-op sign-off
Illustrative sample. Wasatch Grid Electrical is a fictional company; a real Playbook is produced in the client’s own brand.5 / 8
Wasatch Grid ElectricalRisk register
Your failure questions, pre-answered
RiskLikelihood / impactMitigation on record
Interconnect approval slipsMed / HighPre-work at LOI; utility desk engaged early
Long-lead transformer delayMed / HighOrder at award; alternate vendor qualified
Thermal excursion at rampLow / HighPhased gates; load-bank proof each step
Crew availability at peakMed / MedNamed foremen; second crew standby clause
0
Lost-time incidents, 3 yr
<50ms
Backup transfer, full load
100%
On-schedule energization
Illustrative sample. Wasatch Grid Electrical is a fictional company; a real Playbook is produced in the client’s own brand.6 / 8
Wasatch Grid ElectricalCapacity & bonding
What gets checked before anyone reads page two

The gate, already cleared.

ScreenWasatch GridWhy it gates the award
Surety / bonding$40M single · $120M aggregateNo bond, no bid at hyperscale
Financial strengthAudited statements; LOC in placeA thin sub is schedule risk
Manpower depth140 electricians · 9 named GF/foremenThe ramp cannot wait on hiring
EquipmentOwned line trucks, cranes, test gearRentals slip the critical path
Licensing footprintUT · NV · ID · WY (master electrical)Multi-state campuses need coverage
CertificationsNETA · NICET III · OSHA 30Procurement disqualifies without
SafetyEMR 0.71 (3-yr avg) · 0 lost-timeThe owner’s insurer screens EMR first
$120M
Aggregate bonding capacity
0.71
EMR · 3-year average
140
Electricians on the bench
Illustrative sample. Wasatch Grid Electrical is a fictional company; a real Playbook is produced in the client’s own brand.7 / 8
WASATCH GRID ELECTRICAL
The ask
Thirty minutes, before the electrical package is awarded.

We are ready to own the power critical path. The rest is a conversation.

estimating@wasatchgrid.example · (801) 555-0148

Illustrative sample. Wasatch Grid Electrical is a fictional company; a real Playbook is produced in the client’s own brand.8 / 8
1 / 8

Industries We Serve

Aerospace & DefenseBiotechnologyMedical & HealthcareManufacturingFinancial ServicesConsumer ProductsEnterprise Software

New Business

Start a project

Headquarters

North America

© 2026 Bttr. All rights reserved.